Wind turbines keep getting bigger

Transporting of a Vestas rotor blade through Jutland farmland.

2024-05-08  740  中等

But there’s a hitch. Today’s longest blades have become too big to be delivered to inland wind farms. They can be taken only by ship to offshore sites, where building costs are far higher.

经济学人和华尔街日报的文章是会员专属

请加入会员以继续阅读完整文章

成为会员后您将享受无限制的阅读体验,并可使用更多功能


免责声明:本文来自网络公开资料,仅供学习交流,其观点和倾向不代表本站立场。