
Construction surrounding the unfinished Santa Giulia Arena on Monday.
2026-01-16 1201词 困难
0:00
0:00
此音频仅限会员使用成为会员
At a test event on the ice hockey rink at Santa Giulia Arena last weekend, two levels of the venue were off limits to spectators, with sheets of black plastic concealing rows of seats. Paint splattered the floors, and construction dust coated railings. Large wires poked out of walls, and digital scoreboards were not yet installed.
免责声明:本文来自网络公开资料,仅供学习交流,其观点和倾向不代表本站立场。